Author: Site Editor Publish Time: 2022-09-29 Origin: Site
HGT has signed a contract with Baker Hughes to supply the condenser for the FPSO “Maria Quiteria”. Which includes the design, manufacture and installation of the condenser.
At the beginning of the project, the two sides have gone through several rounds of project communication and technical clarification, HGT solved the special requirements of FPSO on condenser size, structure, manufacturing process and other aspects by excellent technology, and stood out from many European and American competitors, successfully won the contract.
The FPSO “Maria Quiteria” will be deployed in the Jubarte field, offshore Brazil, in the fourth quarter of 2024 to serve the Parque das Baleias integrated project, with a capacity to process 100,000 barrels of oil and 5 million cubic meters of gas per day.
In fact, HGT has always paid attention to offshore projects and maintained close communication with the leading FPSO operators of the world for a long time. This signing is a good start for the company to further accelerate the pace of offshore projects, which is of great significance to the subsequent projects. At the same time, the company will focus on product quality control and technological innovation, and continue to keep a high standard of product delivery.