Power Plant

Main products cover the engineering equipment of water condensation system, air condensation system and oil supply system, which hold the leading position domestically in the same industry and enjoy an increasing international reputation.

150MW CCPP Project

End Client: Anshan Iron and Steel Group
Corporation
Job Site: An'shan, China
Service: MHI
Year of Delivery: 2007
Key Words: WCC, Rectangular,5200m²

20MW Waste Heat Recovery Project

End Client: Dalian Fujia Group Co.,Ltd.
Job Site: Dalian, China
Service: HTC
Year of Delivery: 2017
Key Words: ACC,193.2 T/H Flow Rate,Flat Tube,lowest temperature -20℃

225MW CCPP Project

End Client: SEMBCORP
Job Site: Myingyan, Myanmar
Service: BHGE
Year of Delivery: 2016
Key Words: WCC, 7300m², Axial, Flexible Connection

50MW Molten Salt Thermal Power Plant Project

End Client: Qinghai Golmud Luneng New
Energy Co.,Ltd.
Job Site: Qinghai, China
Service: /
Year of Delivery: 2019
Key Words: Cooling Tower, -33.6℃ ~35.5℃, High Altitude & Highland Storm

730MW CCPP Project

End Client: KAR Electrical Power Production Trading FZE.
Job Site: AL-Rumailah, Iraq
Service: Siemens AG
Year of Delivery: 2017
Key Words: WCC, Rectangular, 23100m²/34700 m²
We will persistently contribute to leading the development and innovation of China turbo-machinery auxiliary equipment and actively face the challenge from global equipment manufacture industry.

Contact Us

QUICK PAGE

PRODUCTS

CONTACT US

  :   Sales: zwd@htc.cn
         Marketing: pengh@htc.cn
   :   +86 571-857-84700
  :   (6th Floor, Hangzhou Steam Turbine Power Tower, No.1188 Dongxin Road, Hangzhou China.)
  :   (No.10 Tangwang Street, Tangqi Industrial Zone, Tangqi Town Hangzhou 311106 China)
Copyright  Hangzhou Steam Turbine Auxiliary Equipment Co., Ltd. All rights reserved.