Main products cover the engineering equipment of water condensation system, air condensation system and oil supply system, which hold the leading position domestically in the same industry and enjoy an increasing international reputation.
APCI NEOM Green Hydrogen STG Project
End Client: NEOM Job Site: Saudi Arabia Service: Baker Hughes (Nuovo Pignone S.r.l.) Year of Delivery: 2025 Key Words: ACC, Green Hydrogen, 3700㎡
2200 MTPD Ammonia &3850 MTPD Urea Project
End Client: Hindustan Urvarak & Rasayan Ltd.
Job Site: India Service: MAN Energy Solutions Year of Delivery: 2020 Key Words: WCC, Ammonia Unit
20MTA Refinery and Chemical Complex Project
End Client: Hengli Petrochemical(Dalian) Refinery Co.,Ltd. Job Site: Dalian, China Service: BHGE Year of Delivery: 2018 Key Words: Lube Oil Unit, 1880 L/min Oil Flow& 32.7m³ Oil Tank, H₂ Rich Compressor
2,200MTPD Ammonia Project
End Client: PhosAgro Job Site: Cherepovets, Russia Service: MHI, Jord Year of Delivery: 2014 Key Words: ACC, -38 ℃ ~39 ℃ , H₂ RichCompressor
2000KTA PTA Project
End Client:Zhejiang Yisheng Petrochemical Co.,Ltd. Job Site: Ningbo, China Service: Man Energy Solutions Year of Delivery: 2011 Key Words: WCC, 5000m², Axial, Rigid Connection
BP EPCM Cakra Donya Project
End Client: PT BP Petrochemicals Indonesia Job Site: Indonesia Service: MAN Energy Solutions Year of Delivery: 2021 Key Words: WCC, PTA Unit, Rigid Connection
Naphtha Complex Project
End Client:Assiut Oil Refining Co.,Ltd. Job Site: Assiut, Egypt Service: Man Energy Solutions Year of Delivery:2019 Key Words: WCC, 260m², Axial, Rigid Connection
FLOAT Glass Project
End Client: Triangle Engineering Co.,Ltd.
Job Site: Kabinburi, Thailand Service: / Year of Delivery: 2016 Key Words: ACHE, 0 ℃ ~42 ℃ , High Temperature& Large Unit Size
Coal Deep Processing Demonstration Project
End Client: Sinopec Engineering Incorporation Job Site: Ordos,China Service: HTC Year of Delivery: 2014 Key Words: ACC, Lowest Temp -30.4℃
40MTA Refining-Chemical Integration Project
End Client: Zhejiang Petrochemical Co.,Ltd. Job Site: Zhoushan,China Service: HTC Year of Delivery: 2020 Key Words: ACC 26 Units, WCC 33 Units
1500KTA Ethylene Project
End Client: Hengli Petrochemical(Dalian) Refinery Co.,Ltd. Job Site: Changxing Island, China Service: ELLIOTT Year of Delivery: 2019 Key Words: Lube Oil Unit, 1125.33L/min Oil Flow &17.2 m3 Oil Tank, Ethylene Compressor
1000KTA PET& 1200KTA PTA Project
End Client: Mossi&GHISOLFI
Job Site: Texas, USA Service: MAN Energy Solutions Year of Delivery: 2015 Key Words: ACC, PTA Unit/PEA Unit
900KTA Aromatic Project
End Client: Ningbo Zhongjin Petrochemical Co.,Ltd. Job Site: Ningbo, China Service: HTC Year of Delivery: 2013 Key Words: ACC, -4℃~42.5℃,High wind &Corrosion
We are committed to leading the development of China auxiliary equipment for turbomachinery; taking active actions in response to challenges from global equipment manufacturing industry.