Main products cover the engineering equipment of water condensation system, air condensation system and oil supply system, which hold the leading position domestically in the same industry and enjoy an increasing international reputation.
1000KTA PTA Project
End Client:Zhejiang Yisheng Petrochemical Co.,Ltd. Job Site: Ningbo, China Service: Man Energy Solutions Year of Delivery: 2011 Key Words: WCC, 5000m², Axial, Rigid Connection
2,200MTPD Ammonia Project
End Client: PhosAgro Job Site: Cherepovets, Russia Service: MHI, Jord Year of Delivery: 2014 Key Words: ACC, -38 ℃ ~39 ℃ , H₂ RichCompressor
FLOAT Glass Project
End Client: Triangle Engineering Co.,Ltd. Job Site: Kabinburi, Thailand Service: / Year of Delivery: 2016 Key Words: ACHE, 0 ℃ ~42 ℃ , High Temperature& Large Unit Size
Naphtha Complex Project
End Client:Assiut Oil Refining Co.,Ltd. Job Site: Assiut, Egypt Service: Man Energy Solutions Year of Delivery:2019 Key Words: WCC, 260m², Axial, Rigid Connection
20MMTA Refinery and Chemical Complex Project
End Client: Hengli Petrochemical(Dalian) Refinery Co.,Ltd. Job Site: Lian Yun Gang, China Service: BHGE Year of Delivery: 2011 Key Words: Lube Oil Unit, 1880 L/min Oil Flow& 32.7m³ Oil Tank, H₂ Rich Compressor
900KTA Aromatic Project
End Client: Ningbo Zhongjin Petrochemical Co.,Ltd. Job Site: Ningbo, China Service: HTC Year of Delivery: 2013 Key Words: ACC, -4℃~42.5℃,High wind &Corrosion
1500KTA Ethylene Project Crack Gas Unit
End Client: Hengli Petrochemical(Dalian) Refinery Co.,Ltd. Job Site: Changxing Island, China Service: ELLIOTT Year of Delivery: 2019 Key Words: Lube Oil Unit, 1125.33L/min Oil Flow &17.2 m3 Oil Tank, Ethylene Compressor
We are committed to leading the development of China auxiliary equipment for turbomachinery; taking active actions in response to challenges from global equipment manufacturing industry.